Owner:
Maryland Transportation Authority (MdTA)
Cherry Hill Contract Value:
$86.8 million
Project Description:
This project consists of widening a section of I-95 in order to provide two express toll lanes in each direction. The express toll lanes will consist of a 12’ outside shoulder, two 12’ lanes and a 4’ inside shoulder. The general purpose lanes will be separated from the express toll lanes by a concrete barrier and will consist of a 14’ outside shoulder (4 or 5) 12’ lanes and a 12’ inside shoulder. The existing bridge at Chesaco Avenue will be extended and soil nail walls constructed at the Chesaco and Hazelwood Avenue structures.
Scope of Work:
- Full depth pavement construction
- Box culvert extension
- Storm drain improvements
- Stormwater management facilities
- Retaining wall structures
- Noise wall structures
- Utilities
- Signage structures
- Lighting
- ITS devices
- Toll gantry foundations and conduit
- Landscaping
- Pavement markings
Estimated Date of Completion: January 2011